Search CompleteMarkets

Enter one or more keywords to search.

Wildcards - "*" and "?" are supported.

Search results for: Debris-Removal-Bond
Results per page: Category:
2 results found
https://completemarkets.com/Article/article-post/1570/SAFETY-AND-HAZARD-INSPECTION-SURVEY/
...per removal and storage of scrap, debris and waste [ ] Combustible, metallic...ums of flammable liquids grounded and bonded to containers during dispensing? ...

https://completemarkets.com/company/CompleteMarkets/Articles/content-package/IMMS-Library/TabCategory/article-post/1025/HOW-TO-AVOID-THE-12-MOST-COMMON-CAUSES-OF-BROADCAST-TOWER-LOSS/
... the nearest radial by copper strap. For grounded towers, at least four 10-foot rods must be bonded to the tower base and in contact with the groundwater table. Soil must be tested to determine conductivity. For insulated towers, the ball gap should be clear of debris so that the bare metal is exposed. Insulated towers should have a static drain choke connected between the feedline and the station ground. Insulated towers should have two 12-foot loops in the feedline between the tower and the transmitter housing. Cadwelding the connections is recommended. ... types of crime and reducing the possibility of injury. The transmission building, the tower base, and guy anchors should all be fenced-if not the entire property. Along with minimizing the possibility of vandalism, fencing provides protection for these key areas from being struck by trash removers or farm equipment. Barbed wire should be added to the fencing around these facilities. AM towers can cause electrical injury to animals or people, so it is prudent to erect fencing. Also, the effects of RF radiation emphasize the need to control public accessibility ... beacon. Use binoculars to verify that the rods are in place and in good condition since severe lightning hits may vaporize them. Guy wire anchor points should be grounded to the nearest radial by copper strap. For grounded towers, at least four 10-foot rods must be bonded to the tower base and in contact with the groundwater table. Soil must be tested to determine conductivity. For insulated towers, the ball gap should be clear of debris so that the bare metal is exposed. Insulated towers should have a static drain choke connected ...